Project Name: Heavy-Duty Racking System
Client: Taizhou Certain Limited Liability Company
Project Location: Taizhou
Project Scale: Over 1 million RMB
Construction Period: 10 days
Project Features: The system is assembled from vertical columns, horizontal beams, cross braces, diagonal braces, and self-locking bolts, which allows for easy assembly, strong load-bearing capacity, and low cost. The horizontal beams are made from specially designed cold-rolled closed beams. When connecting the column clips to the vertical columns, they are equipped with specially designed safety pins to ensure that the horizontal beams do not disengage under external impact.
Contact Information:
E-mail:
Operation Center:
Long press the QR code to open the website
Z-WINNER INTELLIGENT